RAM MANDIR UPDATE: Yogi Adityanath will set up a Temporary Ram Temple in Ayodhya at 4 am on 25 March 2020
As we all know that the construction of the Grand Shri Ram Temple in Ayodhya is going on.
We have brought this news to you related to the Ram Temple
After 27 years, on March 25, 2020, Ramlala will be TAKEN out of the tent and placed in the Temple of f\Fiber (which is built in Delhi).
Ramlala (रामलला) will be kept here a day before Chaitra Navratra (चैत्र नवरात्र) (25 April to 03 April).
Shri Champat Ray, General Secretary of Shri Ram Janmabhoomi Tirtha Kshetra informed this
TEMPORARY RAM TEMPLE:
On March 25, 2020, Ramlal’s Statue will be removed from the tent and installed in the Temple of Fiber.
THE THRONE:
For the Temporary Temple of Ramlala, the former royal family of Jaipur presented the Throne to the Trust made of 10 kg silver.
RAM MANDIR CONSTRUCTION:
The temple work will be started in Ayodhya where there is a statue of Ram Lala
Therefore, Uttar Pradesh Chief Minister Yogi Adityanath will install Ramlala at 4 am on March 25, 2020 in a Fiber Temple on a platform about 500 meters from there.
200 Sadhu Saints from all parts of the country will offer special worship on this occasion.
TRUST BUILDING IN AYODHYA:
Trust General Secretary Mr. Champat Rai has said that it will be the responsibility of the security agencies to build the Fiber Temple and install it inside the temple complex in Ayodhya.
Mr. Roy told that the building of the trust’s Ayodhya office has also been selected.
This Building will be near the checkpoint of the entrance.
RAM MANDIR TRUST MEETING:
The next Meeting of Sri Ram Mandir Trust will be Held in Ayodhya on 04 April, 2020.